⭐⭐⭐ Check the savings details by period
This is a user guide for checking period-by-period resource savings through the Power Schedule Management Service.
This guide will teach you how to perform the following list of tasks for a desired time period on resources with Power Schedules set:
Cost savings through power scheduling
Cost (parameter) that would have been charged if operating for 24 hours
Number of resources to which a schedule is applied
Download RawData Excel used in the chart
1. Check the trend of savings amount by period
→ You can set the desired information by section through the inquiry period / target / resource settings.
Search Period: Set the period you want to search (can be set daily)
Target
All Targets: Compare by setting the target of "Cost per 24 hours" to "All" (all EC2/RDS resources belonging to the account).
Schedule target only: Set the target of "Cost for 24-hour operation" to "Schedule target only" (the classification result through the option is "Success" / "Failure" / "Needs application") to compare charts.
resource
EC2/RDS individual settings possible
Item Description
Cost when operating for 24 hours → Cost when using the resource without turning it off based on ListPrice (cost price) (price when power schedule is not applied)
Actual savings amount → Cost saved due to application of power schedule (% next to it means the percentage saved based on the 24-hour operation cost above)
Schedule applied count: This refers to the number of resources to which a schedule is applied on that date.
2. Download RawData Excel used in the chart
→ If you click “Download Details” at the top right, you can download the RawData used to create the chart in Excel format.
conclusion
→ Through the power schedule management service, you can check cost-related data for the desired period in chart format, and receive the Raw Data used for this in Excel format.