This is a user guide for checking the status of power schedule application and identifying optimization targets.

This guide allows you to easily check the “Power Schedule Application Status” and “Optimization Target” for resources identified as Power Schedule targets and take action.

 

1. Check the status of power schedule management and power schedule optimization.

image-20240909-063924.png

→ Check the status of power schedule application (number)

  1. success → Resources for which the set power schedule operates normally

  2. abnormal → Power schedule is set, but resources where the power schedule does not work properly for various reasons

  3. Need to apply → Resources with missing power schedules (resources identified as power schedule target through the set options, but power scheduling is not set)

  4. exception → Resources that are not subject to power scheduling or resources that have been excluded by the user (required to be excluded from power scheduling or exceptions made by the user through the set options)

  5. Unidentifiable → Resources whose purpose cannot be identified (resources that do not correspond to either the power schedule application or non-application target through the set options)

image-20240909-064746.png

→ The target confirmed in the power schedule application status is "Resource Detail View"of "Search by category" You can check it through .

→ Additionally, you can check the scheduling-related tag keys and values currently set for the target.

image-20240909-064907.png

→ Check the status of power schedule optimization ( % )

→ Additionally, you can simply check the indicators of power scheduling optimization for the selected account through “success rate,” “application rate,” and “identification rate.” (The closer it is to 100%, the better the power scheduling optimization is.)

  

  

2. Check the target for optimization and the amount of savings when optimizing

image-20240909-065016.png

→ Need to apply: Resources identified as power schedule targets but not scheduled

→ Provides information such as the number of targets for each resource/schedule application and the amount saved

image-20240909-065441.png

→ You can check the target of "Maximum monthly savings amount" by selecting "Apply" & "EC2" in "Search by category"

→ Additionally, you can check the scheduling-related tag information status of the resource through the “Scheduler” “Scheduling Tag Key” column.

   

 

3. conclusion

→ By checking the status of power schedule application, you can check the status of power schedule optimization, information on resources requiring additional action, and cost savings when applying.